Lay out floor framing detail on the sill plate.

Layout should include

  • locating wall and floor openings
  • following the building plans
  • selecting the correct tools
  • laying out in 16- and 24-inch on center (OC).

Process/Skill Questions:

  • Which set of plans do you use to determine floor layout?
  • What are some of the specialty details to accommodate floor framing?

NCCER Carpentry Standards

Level One, Module Five (27105-13): Floor Systems

Module Five (27105-13) describes the layout and construction procedures for floor systems, including how to read and interpret construction drawings and specifications, and how to identify different types of framing systems, floor system components, and floor system materials. It also covers how to estimate the amount of materials needed for a floor assembly and on some common alternative floor systems.