Identify bridging and blocking.
Identification should include the
- components
- function
- location once installed
- building code reference for use or installation requirements.
Process/Skill Questions:
- What are the types of metal bridging?
- What are the different uses of bridging and blocking?
NCCER Carpentry Standards
Level One, Module Five (27105-13): Floor Systems
Module Five (27105-13) describes the layout and construction procedures for floor systems, including how to read and interpret construction drawings and specifications, and how to identify different types of framing systems, floor system components, and floor system materials. It also covers how to estimate the amount of materials needed for a floor assembly and on some common alternative floor systems.