Loosen packed soil.

Loosening should include

  • identification of safety concerns and procedures
  • selection of tools and equipment
  • demonstration of the procedures for loosening soil, removing stones, removing soil, and preventing runoff.

Process/Skill Questions:

  • What are some safety concerns that should be considered before digging?
  • Who should be called before digging takes place? Why?
  • What are some of the reasons for loosening packed soil?
  • What are some of the tools that can be used to loosen soil?
  • How can runoff be prevented when loosening soil?