Demonstrate rough-in water supply.

Demonstration should include the following steps:

  • Assemble tools and equipment.
  • Mark the location of pipe routes from the source to the outlets.
  • Shut off the water pressure and drain the lines.
  • Cut the main line and solder or glue the tee into place.
  • Cut the main line and install branch tees.

Process/Skill Questions:

  • What rules should be followed when roughing-in water supply lines?
  • What safety precautions should be followed when roughing-in water supply?
  • What tools and materials are required for roughing-in water supply?