Demonstrate rough-in water supply.
Demonstration should include the following steps:
- Assemble tools and equipment.
- Mark the location of pipe routes from the source to the outlets.
- Shut off the water pressure and drain the lines.
- Cut the main line and solder or glue the tee into place.
- Cut the main line and install branch tees.
Process/Skill Questions:
- What rules should be followed when roughing-in water supply lines?
- What safety precautions should be followed when roughing-in water supply?
- What tools and materials are required for roughing-in water supply?