Replace rotten floor joist.

Replacement should include the following steps:

  • Remove the external sheathing.
  • Evaluate the damage.
  • Remove the rotted joist.
  • Measure and cut the new joist.
  • Replace the joist and sheathing.

Process/Skill Questions:

  • What safety procedures should be followed when replacing a rotted floor joist?
  • What factors may account for the need to replace a rotted floor joist or joists?
  • What is a ledger joist?
  • What is a header (rim) joist?