Replace rotten floor joist.
Replacement should include the following steps:
- Remove the external sheathing.
- Evaluate the damage.
- Remove the rotted joist.
- Measure and cut the new joist.
- Replace the joist and sheathing.
Process/Skill Questions:
- What safety procedures should be followed when replacing a rotted floor joist?
- What factors may account for the need to replace a rotted floor joist or joists?
- What is a ledger joist?
- What is a header (rim) joist?